Beard Beard Ltd completed works on numerous data centres 
Barrie Beard completed works on numerous data centres in South Wales over a three-year period working under main contractors SPIE. 
 
The client had taken over a very large existing building that used to manufacturer semi-conductor parts. This abandoned building was bought back to life around 10 years ago by Next Generation Data and it has slowly been converted into one of the largest data centres in Europe. 
 
Due to the building being existing each data centre was bespoke and built specifically to the requirements of various high-end clients. Due to our successful delivery of the electrical package on our first data centre we completed 7 more halls along with a vast amount of enabling works. We built a fantastic working relationship with SPIE and have worked on them with various projects since. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency installation 
Small power installation 
Distribution 
External lighting 
Support Grid Systems 
Generator/EMS Control Wiring 
Full containment systems 
PDU Cab Wiring 
Section 2 Works 

Project Data 

CLIENT: Vantage 
CONTRACTOR: SPIE 
DURATION: 36 Months 
COMPLETED: September 2018 

Data Centre in South Wales  

Reference 

"Thanks again for the installation work done by your team on site, it really is a proper job. (I don’t get to praise sub-contractors for excellent work enough these days, so a very big thank you for all that’s been done so far)." 
 
Mark Vallance 
Project Manager, SPIE Facilities, SPIE UK 
 
 
"I need to echo Marks comments 
Thanks to Rod and the team" 
 
Neil Dudman 
Senior Operations Manager, SPIE Facilities, SPIE UK 