Sparkhill Leisure Centre
Family Leisure Centre
Barrie Beard Ltd worked with Pellikaan Construction on new leisure centre. It has a state of the art ‘Olympic Legacy’ Swimming Pool, its stainless steel panel pool has become the new 25 metre main pool at the Leisure Centre. It was one of nine swimming pools used across London by the Olympic and Paralympic Athletes during the 2012 games, which were dismantled after the games. The inclusion of this pool in the new Sparkhill Leisure Centre represents a fantastic opportunity for the community, and will see the Olympic Legacy continued within Birmingham.
Barrie Beard Ltd’s scope of work included
Lighting and emergency design and installation
Small power installation
Distribution
Car park lighting
External lighting
Fire alarm system
Public address system
CCTV system
Security alarm
Door monitoring system
Disabled refuge
Accessible WC alarms
Voice and data installation
Turnstile installation
Induction loops
Lightning protection
Incoming gas & water
Specialist swimming pool ventilation
General ventilation
Natural ventilation
LTHW heating c/w CHP unit
Comfort cooling
Water services
Natural gas
Above ground drainage
Sanitary ware
Building management system
Low carbon design
Project Data
CLIENT: Birmingham City Council/Places for People Leisure
CONTRACTOR: Pellikaan Construction Ltd
ARCHITECT: Roberts Limbrick Architects
COMPLETION: June 2017
DURATION: 8 Months
Modern Leisure Centre for Community