The state-of-the-art facility was used to host the aquatics events, swimming and diving, during Commonwealth Games 2022.
The Aquatics Centre is a flagship leisure facility featuring an Olympic-size 50m swimming pool with 10m diving boards, a dedicated studio pool, three activity studios, and two four-court sports halls. The venue also includes a 108-station gym, a 25-station ladies-only fitness suite, an indoor cycling studio, a specialist dry diving centre, sauna and steam rooms, and a range of supporting leisure and wellness facilities.
Externally, the development incorporates a new grass football pitch with changing facilities, a landscaped urban park, a children’s play area and a café, creating a vibrant destination designed to support both elite sport and community wellbeing.
As part of the venue’s transformation following its major event use, the facility was carefully reconfigured to transition into a long-term community asset. This included the removal of 4,000 temporary spectator seats and the addition of two new multi-use sports halls, significantly enhancing the centre’s capacity to support a wide range of sporting and recreational activities.
Our team was proud to deliver the full electrical installation across the project, supporting the redevelopment of this world-class venue and helping prepare the facility for its reopening as a community leisure centre on Monday 24 July 2023.
Barrie Beard Ltd’s scope of work included
Lighting and emergency installation
Small power installation
Distribution
External lighting
Addressable accessible WC alarm
Fully addressable dali lighting control system
Project Data
CLIENT: Sandwell Council
CONTRACTOR: Wates
ARCHITECT: Roberts Limbrick
CONSULTANT: ARUP
COMPLETION: Phase 3 April 2023
DURATION: 27 Months