Install the electrical supplies to 2x No Chillers for QE 
Due to climate change and the extremely hot summer last year, we have been asked to install the electrical supplies to 2 No chillers. 
 
The chillers are located in the car park, close to the hospital building. 
 
The chillers will support the existing roof top chillers that struggle with the recent temperature increase during summer. 
 
The supply comes from the roof top switch room. The supplies are 400A. The cable size of each cable is 185mm SWA. The containment is 300mm ladder, fixed via brackets to the fabric of the building, 

Barrie Beard Ltd’s scope of work included 

Install the electrical suppliers to 2x No chillers 

Project Data 

CLIENT: NHS 
CONTRACTOR: Equans 