Perdiswell Leisure Centre, Worcester
Multi-million pound Sports Centre in Worcestershire
The electrical contract at the new multi-million-pound sports centre commenced was completed in January 2017.
The new 25m eight lane swimming pool is suitable for swimmers of all abilities and has seating for 250 spectators. Built to Amateur Swimming Association (ASA) and Sport England’s standards, it hosts national and regional competitions, turning Worcester into a top swimming destination.
The new centre has an eight lane 25 metre competition pool and a separate 18mx10m learner pool with a moveable floor to allow a variety of uses. Other facilities include a new gym, a 120 station gym, 2 new multi-use studios, refurbished sports hall, café and enhanced wheelchair access.
Barrie Beard Ltd’s scope of work included
Lighting and Emergency design and installation
Small power installation
Distribution
External lighting
Car Park Lighting
Fire alarm system
Turnstile Installation
Public address system
CCTV system
Door access system
Door monitoring system
Security alarm
Disabled refuge
Lightning protection
Panic/Pool alarm system
Voice and data installation
Project Data
CLIENT: Worcester City Council
CONTRACTOR: Speller Metcalfe
COMPLETED: January 2017
DURATION: 15 Months
£ Multi-million sports centre
Tagged as: Sports & Leisure
Share this post: