Impressive new high specification Head Quarters for IM Properties in Shirley 
Completed in August 2019, this high-specification development comprised four distinct elements, delivering a modern and versatile campus environment. 
 
At its centre is a new three-storey headquarters for IM Properties, designed to provide a contemporary and flexible workspace. A standout feature is the use of smart glazing to the second-floor offices, allowing the windows to switch from clear to opaque at the touch of a button, offering enhanced privacy without compromising natural light. 
 
The scheme also includes a dedicated training academy, equipped with specialist training rooms, vehicle ramps, and workshop facilities to support hands-on learning and development. In addition, a separate building was constructed to accommodate the IM Properties charitable organisation, Christian Vision, providing them with a purpose-built base. 
 
Externally, the project was complemented by a comprehensive lighting scheme, incorporating feature lighting to ponds, fountains, and sculptures, enhancing the overall aesthetic and creating an engaging environment across the site. 

Barrie Beard Ltd’s scope of work included 

Lighting & emergency lighting installation to all areas including open plan office space, meeting rooms, gym, commercial kitchen, bespoke breakout areas, rooftop putting green, bridge walkway, workshop academy & services compound. 
Small power installation 
Power and infrastructure to smart glass installation 
Rising busbar distribution 
Underfloor busbar system 
Distribution boards 
External lighting 
Electric car chargers 
Containment installation 
Main distribution panel 
Generator changeover panel 
Generator control cabling installation 
Intelligent Lighting control system 
Specialist supplies and control cabling install for automated blinds 
Water feature supplies 
Cabling and infrastructure to a 7m high audio-visual screen 

Project Data 

CONTRACTOR: BAM 
COMPLETED: August 2019 
DURATION: 12 months 

Impressive high specification, four element project 

Indoor 'smart' lighting and external feature lighting  

References 

"Now that we have completed the project at IM Properties I would like to give my thanks to yourself and all your team for all the hard work they have put in to bring this project to a successful completion. 
 
This was not the easiest project with many additions along the way however your team stuck to the task and produced an excellent installation. We now have a very happy Client who are very pleased with their new building. 
 
Special thanks to your site team excellently managed by Anthony Bold (BB Foreman) with great support from Jason Smith (BB Electrician). They were both very professional in leading a helpful, enthusiastic and dedicated workforce. It was also refreshing to see several apprentices being trained on the project which can only be good for your company's future. 
 
Look forward to working with you on our next project." 
 
Richard Gilbert 
Senior Building Services Manager, BAM 
“We, at IM Properties would like to thank Barrie Beard Ltd for their part in the electrical installation at our new Head Quarters in Solihull, West Midlands. The team worked hard to deliver the best-in-class product which we wanted for our HQ building, and with the help of their site team, transformed our vision into reality with true professionalism.” 
 
Lyndsey Thomas 
IM Properties Solihull, West Midlands 