Electrical Contractors Commercial & Domestic 
Community building with lighting to FA standards on 18 metre columns and floodlit training facilities 
Barrie Beard Ltd were involved in the electrical and mechanical design and installation at Hoe Valley Community Centre. The community building was sub metered and divided into the following areas: Westfield Football Club, Boxing Club, Guides and Sea Rangers, District Scouts, 7th Scouts and Army and Air Cadets – complete with a shooting range. 
 
The community building has a newly laid football pitch with lighting to FA standards on 18 metre columns, together with flood lit training facilities. Within the halls are luminaires which can be raised or lowered for ease of maintenance. 
 
The building was designed to a BREEM excellence standard using a district combined heating and power unit (CHP). 

Barrie Beard Ltd’s scope of work included 

Lighting installation 
Mechanical installation 
Distribution 
Emergency lighting 
Small power 
Fire alarm 
Disabled refuge 
CCTV 
Lightning protection 
Panic alarms 
External football lighting 

Project Data 

CLIENT: Woking Borough Council 
CONTRACTOR: VolkerFitzpatrick 
ARCHITECT: HLM 
COMPLETED: July 2011 
DURATION: 6 months 

Lighting to FA standards 

Tagged as: Sports & Leisure
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings