Hockley Blocks, Birmingham
Internal lighting scheme within Hockley Blocks
Barrie Beard electrical contractors were contracted to assist with Internal lighting scheme within Hockley Blocks, which was completed in February 2022 in conjunction with main building contractor Wates Living Space.
The client wanted to hide the unsightly corridor sprinkler and heating pipes, Barrie Beard Ltd altered the existing lighting from surface, to new recessed following the install of a new suspended ceiling.
Tower names, Geach Martinau and Scholfield.
Barrie Beard Ltd’s scope of work included
Lighting and emergency design and installation
Project Data
CLIENT: Birmingham City Council
CONTRACTOR: Wates Living Space
COMPLETED: February 2022
DURATION: 12 Months
Tagged as: Apartments & Residential
Share this post: