Hartshill Academy, Nuneaton
First class learning environment
The Barrie Beard Ltd team close to finishing the delivering the electrical package appointed by Wates on the new net-zero carbon Hartshill Academy in Nuneaton.
The works include replacing the existing school building, and providing space for 1,050 students. The new, state-of-the-art building will have improved fabric performance to increase energy efficiency.
The objective is to replace the existing secondary school with a modern, efficient three-story school building and improve the surrounding campus to provide a positive establishment.
Barrie Beard Ltd’s scope of work included
Containment installation throughout
Lighting and emergency lighting installation
Small power installation
Distribution
External lighting
Turnstile installation
Fully addressable Dali lighting control system
Project Data
CLIENT: Hartshill Academy
CONTRACTOR: Wates
CONSULTANT: CSD Ltd
DURATION: 10 months
State-of-the-art school
Tagged as: Education