Filton Leisure Centre
New stylish family leisure centre
Barrie Beard Ltd have recently finished working on-site, at the new extension of Filton Leisure Centre for Speller Metcalfe.
Speller Metcalfe has been contracted by Active Nation to provide a extension to current leisure centre facilities.
The works includes the demolition of the existing reception area and changing rooms, along with a new extension to expand the provision of community facilities.
The focus of the construction is to expand the facilities around the swimming pool area including both wet and dry side changing, alongside improvements to the building.
Barrie Beard Ltd’s scope of work included
Lighting and emergency design and installation
Small power installation
Distribution
External lighting
Car park lighting
Fire alarm system
Turnstile installation
CCTV system
TV system
Door access system including
Security alarm
Addressable acessible WC alarm
Disabled refuge
Voice and data installation
Lighting protection
Mechanical ventilation
Mains distribution
Low voltage cabling and main earthing
Incoming gas & water
General ventilation
Natural ventilation
LTHW heating c/w CHP unit
Gas radiant heating
Comfort cooling
Water services
Natural gas
Above ground drainage
Sanitaryware
Building management system
Low carbon design
Project Data
CLIENT: Active Nation
CONTRACTOR: Speller Metcalfe
ARCHITECT: Watson Batty Architects
COMPLETED: Autumn 2023
Modern Leisure Centre in Bristol
Tagged as: Sports & Leisure
Share this post: