Campus East, Welwyn Garden City
Residential Project
Decarbonisation scheme completed at Campus East, Welwyn Garden City on behalf of Welwyn Hatfield Borough Council.
Barrie Beard Ltd’s scope of work included
We have supplied and installed new LV mains tails from the existing 1000a TPN isolator switch located within the basement. This is to supply the new 1000A MDP
The new mains cables consist of 1x 400mm2 XLPE/LSZH/AWA/LSZH single cables per phase and neutral, with 1 x 240mm2 main earth cable
A new Main LV Switchboard has been supplied and installed to provide power for the existing building. The new Main LV Switchboard has been designed, manufactured, supplied, and commissioned by our specialist supplier for this project, Northern Switchgear. This will also accommodate x2 125A Three phase power supplies to the newly installed ASHP’s
Modifications to the existing PV system
Project Data
CLIENT: Welwyn Hatfield Borough Council
COMPLETED: January 2023