Electrical Contractors Commercial & Domestic 
Sports & Leisure 
 
The new build leisure centre features a 165-station fitness suite, including a virtual cycling studio. It has a separate learner pool with a moveable floor to allow a variety of uses. A 25 metre 7 lane main swimming pool together with changing rooms and shower facilities plus a splash-zone. It benefits from an 8 court sports hall, 2 squash courts, a dance studio, 3 new multi-use studios, an adventure play area with clip and climb, and a cafe. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency design and installation 
Small power installation 
Distribution 
External lighting 
Car Park lighting 
Fire alarm system 
Turnstile installation 
Public address system 
CCTV system 
Door access system 
Door monitoring system 
Security alarm 
Disabled refuge 
Lightning protection 
Panic / pool alarm system 
Voice and data installation 
Incoming gas & water 
Specialist swimming pool ventilation 
General ventilation 
Natural ventilation 
LTHW heating c/w CHP unit 
Gas radiant heating 
Comfort cooling 
Water services 
Natural gas 
Above ground drainage 
Sanitary ware 
Building management system 
Low carbon design 

Project Data 

CLIENT: Places for People 
CONTRACTOR: Pellikaan Construction Ltd 
COMPLETION: April 2019 
DURATION: 15 months 
BIM: Yes 

Andover Leisure Centre, Hampshire 

Tagged as: Sports & Leisure
Share this post:

Leave a comment: