Electrical Contractors Commercial & Domestic 
Bring the historic Grade II-listed Boden Mill site back into use. 
The project is part of a wider regeneration scheme to bring the historic Grade II-listed Boden Mill site back into use, with a main focus on the new leisure centre and swimming pool. 
 
Two storey leisure centre, includes a state-of-the-art 50-60 station gym, a 25 metre swimming pool and learner pool, various exercise and fitness studios, an adventure play facility and a cafe. Extension to the existing car park. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency design and installation 
Small power installation 
Distribution 
External lighting 
Car park lighting 
Fire alarm system 
Turnstile installation 
Public address system (PAVA) 
CCTV system 
TV system 
Door access system 
Security alarm 
Addressable accessible WC alarm 
Panic / pool alarm system 
Disabled refuge 
Voice and data installation 
Lighting protection 
Mechanical ventilation 
Low voltage cabling and main earthing 
Photovoltaic installation 
Incoming gas and water 
Specialist swimming pool ventilation 
General ventilation 
Natural ventilation 
LTHW heating c/w CHP unit 
Comfort cooling 
Water services 
Natural gas 
Above ground drainage 
Sanitary ware 
Building management system 
Low carbon design 

Project Data 

CLIENT: Alliance Leisure 
CONTRACTOR: Speller Metcalfe 
ARCHITECT: AHR 
CONSULTANT: Hydrock 
COMPLETED: September 2021 
DURATION: 10 Months 