Electrical Contractors Commercial & Domestic 
New family leisure centre on London Road with state-of-the-art facilities 
The new Morden Leisure Centre was completed in September 2018 in conjunction with main building contractor Pellikaan Construction Ltd. The new family leisure centre on London Road will replace the 1960’s Morden Park Pools and includes a 25m six-lane pool, a large second pool with moveable floor for aqua aerobics; diving boards; a fitness suite with approximately 100 stations; a large studio / community room and a café. 
 
The leisure centre will also feature state of the art disabled facilities including a designated ‘changing places’ room, which will house an accessible toilet and shower, changing table and hoist. There will also be a ‘pool pod’ which is a special platform by the pool which gives ease of access for disabled swimmers to get in and out of the water. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency design and installation 
Small power installation 
Distribution 
External lighting 
Car park lighting 
Fire alarm system 
Turnstile installation 
Public address system 
CCTV system 
TV system 
Door access system 
Security alarm 
Panic/pool alarm system 
Disabled refuge 
Voice and data installation 
Lightning protection 
Incoming gas and water 
Specialist swimming pool ventilation 
General ventilation 
Natural ventilation 
LTHW heating c/w CHP unit 
Comfort cooling 
Water services 
Natural gas 
Above ground drainage 
Sanitary ware 
Building management system 
Low carbon design 

Project Data 

CLIENT: G.L.L 
CONTRACTOR: Pellikaan Construction Ltd 
COMPLETED: September 2018 
DURATION: 8 Months 
BIM: Yes 

Modern revamp of Morden Leisure Centre 

Tagged as: Sports & Leisure
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings