Electrical Contractors Commercial & Domestic 
Project Overview 
 
Barrie Beard was appointed by BAM Construction to deliver the electrical services installation as part of the refurbishment of an existing Grade II listed building. 
 
The project involved the installation and coordination of a comprehensive range of electrical and specialist systems within a challenging historic environment. Particular care was required throughout the project to preserve the building's existing architectural features while integrating modern electrical infrastructure to meet the project specification and current standards. 
 
Scope of Works 
 
Our works included: 
 
Electrical design and coordination 
Main incoming electrical supply 
Main LV switchboard and distribution 
Sub-distribution boards 
Containment and wiring systems 
Small power installation 
Internal, external and emergency lighting 
Lighting control systems 
Fire detection and alarm systems 
Intruder detection and alarm systems 
Access control 
CCTV systems 
Structured cabling 
Disabled refuge and accessible WC alarm systems 
Induction loops 
Electrical supplies to mechanical plant 
Lightning protection 
Earthing and bonding 
Project Objectives 
 
The primary objective was to deliver a high-quality, fully coordinated electrical installation across a complex Grade II listed building, while ensuring all specialist systems operated correctly and in accordance with the client's specification. 
 
A key focus was maintaining a strong working relationship with BAM Construction, coordinating effectively with other trades and specialist subcontractors, and delivering the project safely, on programme and in a commercially successful position. 
 
Project Challenges 
 
Working within a Grade II listed building presented significant challenges. The existing structure and architectural features had to be carefully considered throughout the installation, with restricted areas and unforeseen obstacles requiring solutions that balanced the requirements of the modern electrical installation with the need to preserve the character of the building. 
 
Close coordination, careful planning and a flexible approach were essential to overcome these challenges and maintain progress throughout the project. 
 
Successful Delivery 
 
Despite the complexities associated with working within a historic listed building, Barrie Beard successfully delivered the electrical installation to the required standard and programme. 
 
The project demonstrates our ability to deliver complex, multi-service electrical installations within challenging environments, combining technical expertise, specialist coordination and practical problem-solving while maintaining the integrity of the existing building. 

Project Data 

Client: Wyre Forest City Council 
Contractor: BAM Construction 
Completion Date: March 2025 
Project Duration: 49 Weeks 