Electrical Contractors Commercial & Domestic 
New Carnival Hub brings together a leisure centre and a new home for Wokingham library 
The new state-of-the-art leisure centre facility includes a library as well as swimming pools, a children's splash pad, a health suite (sauna, salt, and steam rooms), 120 station fitness suite, fitness studios including a group cycling studio, a cafe and a dual-purpose hall for sports or 400 seat-cultural performances. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency design and installation 
Small power installation 
Distribution 
External lighting 
Fire alarm system 
Turnstile installation 
CCTV system 
Security alarm 
Addressable accessible WC alarm 
Panic / pool alarm system 
Disabled refuge 
Voice and data installation 
Lighting protection 
Fully addressable dali lighting control system 
Photovoltaic installation 
Induction loop 
Incoming gas & water 
Specialist swimming pool ventilation 
General ventilation 
Natural ventilation 
LTHW heating c/w ASHP units 
Underfloor heating 
Comfort cooling 
Water services c/w ASHP units 
Natural gas 
Above ground drainage 
Sanitary ware 
Building management system 
Super low carbon design 
BREEAM 2018 

Project Data 

CLIENT: Wokingham Borough Council 
CONTRACTOR: Pellikaan Construction Ltd 
ARCHITECT: Robert Limbrick 
CONSULTANT: Cundall 
SURVEYOR: Faith & Gould 
COMPLETION: July 2022 
DURATION: 18 Months 
BIM: Yes 

Flexible cultural use of the space  

Tagged as: Sports & Leisure
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings