Carnival Leisure Centre
New Carnival Hub brings together a leisure centre and a new home for Wokingham library
The new state-of-the-art leisure centre facility includes a library as well as swimming pools, a children's splash pad, a health suite (sauna, salt, and steam rooms), 120 station fitness suite, fitness studios including a group cycling studio, a cafe and a dual-purpose hall for sports or 400 seat-cultural performances.
Barrie Beard Ltd’s scope of work included
Lighting and emergency design and installation
Small power installation
Distribution
External lighting
Fire alarm system
Turnstile installation
CCTV system
Security alarm
Addressable accessible WC alarm
Panic / pool alarm system
Disabled refuge
Voice and data installation
Lighting protection
Fully addressable dali lighting control system
Photovoltaic installation
Induction loop
Incoming gas & water
Specialist swimming pool ventilation
General ventilation
Natural ventilation
LTHW heating c/w ASHP units
Underfloor heating
Comfort cooling
Water services c/w ASHP units
Natural gas
Above ground drainage
Sanitary ware
Building management system
Super low carbon design
BREEAM 2018
Project Data
CLIENT: Wokingham Borough Council
CONTRACTOR: Pellikaan Construction Ltd
ARCHITECT: Robert Limbrick
CONSULTANT: Cundall
SURVEYOR: Faith & Gould
COMPLETION: July 2022
DURATION: 18 Months
BIM: Yes
Flexible cultural use of the space












Tagged as: Sports & Leisure
Share this post: