Barrie Beard Ltd were involved in the design and installation of the new 55,000 sq ft technical centre for Peugeot UK. The installation was designed to give a high lighting level of 1,000 lux average.
The new technical centre will train up to 140 dealers per day and have 50 staff.
Barrie Beard Ltd’s scope of work included:
Client: Parkridge Developments / Peugeot UK
Main contractor: John Sisk & Son Ltd
Contract duration: 12 months
Contract value: £320,000