Electrical Contractors Commercial & Domestic 
Family Leisure Centre 
Barrie Beard Ltd worked with Pellikaan Construction on new leisure centre. It has a state of the art ‘Olympic Legacy’ Swimming Pool, its stainless steel panel pool has become the new 25 metre main pool at the Leisure Centre. It was one of nine swimming pools used across London by the Olympic and Paralympic Athletes during the 2012 games, which were dismantled after the games. The inclusion of this pool in the new Sparkhill Leisure Centre represents a fantastic opportunity for the community, and will see the Olympic Legacy continued within Birmingham. 

Barrie Beard Ltd’s scope of work included 

Lighting and emergency design and installation 
Small power installation 
Distribution 
Car park lighting 
External lighting 
Fire alarm system 
Public address system 
CCTV system 
Security alarm 
Door monitoring system 
Disabled refuge 
Accessible WC alarms 
Voice and data installation 
Turnstile installation 
Induction loops 
Lightning protection 
Incoming gas & water 
Specialist swimming pool ventilation 
General ventilation 
Natural ventilation 
LTHW heating c/w CHP unit 
Comfort cooling 
Water services 
Natural gas 
Above ground drainage 
Sanitary ware 
Building management system 
Low carbon design 

Project Data 

CLIENT: Birmingham City Council/Places for People Leisure 
CONTRACTOR: Pellikaan Construction Ltd 
ARCHITECT: Roberts Limbrick Architects 
COMPLETION: June 2017 
DURATION: 8 Months 

Modern Leisure Centre for Community 

Tagged as: Sports & Leisure
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings