Electrical Contractors Commercial & Domestic 
Touch screen lighting installation to control and dim luminaires throughout the Grand Pier 
Barrie Beard Ltd secured this contract in October 2009. The project involved the complete design and installation of all elements which are detailed below.  
 
The lighting installation consisted of a touch-screen computer which controlled and dimmed the luminaires throughout the pier, either individually or in groups.  
 
The pavilion itself was not physically/mechanically attached to the pavilion deck, which entailed a 50mm deflection between the two structures. This created design issues regarding containments and cabling.  
 
Small power consisted of supplies to each games machine, rides/attractions, kitchen facilities and general socket outlets. 

Barrie Beard Ltd’s scope of work included 

General lighting 
Specialist lighting 
Small power 
Supplies to all attractions 
Fire alarm/voice activation 
Public address 
Music system 
Intruder alarm 
Disabled refuge and alarms 
Induction loops 
High voltage and low voltage installations 
Lightning protection 

Project Data 

CLIENT: Grand Pier Ltd 
CONTRACTOR: John Sisk & Son Ltd 
COMPLETED: October 2010 
DURATION: 11 Months 

Touch-screen lighting installation  

Luminaires throughout the pier 

References 

"We found Barrie Beard Ltd to be accommodating, professional and very thorough in their approach to their work and they were easily the best performing sub-contractor on site throughout the re-building process. We would have no hesitation in recommending them and we look forward to working with them again on our own future projects." 
 
Kerry Michael 
Managing Director, Grand Pier 
"This project is extremely challenging, the works are located at the end of a 250m long jetty and the pavilion building is suspended over the tidal section of the Bristol Channel....an unusual logistic and safety situation that requires specific careful and disciplined management. Barrie Beard have been, without doubt, the most proactive and cooperative contractor engaged on this project." 
 
Richard Sutton 
Senior Contracts Manager, Sisk 
Tagged as: Heritage
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings